$6,507.38
$5,915.80
The Cata-Dyne™ BX Series infrared gas catalytic heater with 'G' Series catalytic pad is designed for use in non-hazardous heating applications such as infrared drying and curing ovens. It is...

FREE
SHIPPING

100% MONEY
BACK GUARANTEE

ONLINE
SUPPORT 24/7

Availability: Out Of Stock
FREE SHIPPING
( in the continental US )

The Cata-Dyne™ BX Series infrared gas catalytic heater with 'G' Series catalytic pad is designed for use in non-hazardous heating applications such as infrared drying and curing ovens. It is fitted with a patented high temperature catalyst pad, operates on either natural or propane fuel and is available in a wide variety of cabinet sizes.
Applications - The large surface area of the Cata-Dyne™ heater allows for efficient transfer of infrared heat that can be used in a variety of applications including: - facility space heating - process heating - freeze protection - comfort heating for personnel - ovens.
Features • Internal heater components such as our proprietary catalyst pad and preheat Caloritech™ tubular element are manufactured in-house • Multiple Btu input ratings and a variety of standard heater sizes available • Offered in a variety of preheat voltages • natural gas (NG) or propane (LPG) configurations • Choice of manual control or electronic control options • Multiple heater mounting bracket configurations available • Heater contains no moving parts and is designed to operate indefinitely when supplied with air and clean fuel Certifications • G Series catalytic pad is certified by Canadian Standards Association (CSA) and Factory Mutual (FM) and (European standards) for non-hazardous area applications.

 

Current Lead Time: 1-2 weeks

Dimensions 9 1/2" x 72" x 26 1/2"
Manufacturer Cata-Dyne
Freight Classification Number 150
Does this product only ship LTL? No
Is this product returnable? No
HTS Code 8479.89.9899
Color Stainless Steel
Construction Stainless Steel
Heat Range Min: -40°F (-40°C) Ambient | Max: 104°F (40°C) Ambient
Watts 2880
Amps 4.8
Volts 600-1Ø
Certifications CSA FM
Lead Time 1-2 weeks